Groundwork - pouring and finishing slab

It is time to pour the slab. We are using Smith's again and this time we are using a Gen 3 and pouring to a minimum depth of 100mm.

 

 

When pouring we are raking it out to all the areas and getting a bit of level to it.

 

 

Instead of a beam screed we are using a 50mm x 120mm x 5.1 m board to get a level on the slab.

 

We will let this dry for approximately 4 hours. Once the concrete has start to set we are using a power float.

 

 

Our first runs are with a pan which is a bit more forgiving to start with. We do one pass over the wait 30 - 45 minuates then another.

 

 

Our final 2 runs are with the paddles. The paddles are tilted at an increasing angle each time. This gives a smooth finish.

 

 

To keep the slab from drying out too fast we have waited several more hours then covered with a layer of sand.

 

 

 