Building the shell

 

 

Bringing the walls up to the height for the coursing blocks.

 

 

Putting in the concrete lintels over the interior doors.

 

 

 

Putting in the metal lintels from expamet.

 

These are to carry the brick and blocks over exterior openings like windows and doors. These are put in and just build the blocks and bricks straight on.

 

 

Once the lintels are in place we add the T.D.I. cavity closures.

 

We are now ready to bring in the chippies to put in our Trus Joist silent floor system.

 

1 2 3 4 5