|
We have
designate this area for the Hall's Greenhouse |
We have started with the base after clearing some
vegetation.
|
![](../images/DCP02693.jpg)
|
![](../images/DCP02689.jpg)
|
We leveled the ground then set out the base and
made sure it was square and level.
|
Laying out the door gable end.
|
|
![](../images/DCP02698.jpg)
|
We lightly bolted it together then made sure everything
was square before tightening the bolts.
|
Once the
ends are up we added the sides and supports. |
|
|
Starting to install the glass.
|
Prepared a
deep bed on the left and put in some slabs and single and double
staging on the back and right side. |
![](DCP02730.jpg) |
![](../images/DCP02602.jpg)
Before
|
![](DCP02732.jpg)
After
|